Project: |
Site Remediation - Abandoned Fastener
Manufacturer |
Client: |
Raymark Industries |
Services: |
Installed vapor extraction system, consisting of vapor extraction
wells, regenerative blower, and carbon filtration canisters, to remove volatile organic compound
contamination from subsurface soil beneath building. Completed remediation and submitted report
to Regional Water Quality Control Board. |
|
|
Project: |
Site Remediation - Service
Station |
Client: |
Rasmussen Trust |
Services: |
Remediated over 2,000 tons of gasoline-contaminated soil from
leaking underground storage tanks -- by excavation with backhoe and excavators. Employed mobile
laboratory to monitor progress of remediation. Transported contaminated soil to licensed
disposal facility for bioremediation and recycling. Filed report with responsible regulatory
agency. |
|
|
Project: |
Site Remediation - Manufacturing
Facility |
Client: |
Raymark Industries |
Services: |
Remediated over 1,000 tons of petroleum hydrocarbon-contaminated
soil from leaking three stage clarifier and loading dock activities -- by excavation with
backhoe and excavators. Employed two mobile laboratories to monitor progress of remediation.
Transported contaminated soil to licensed disposal facility for bioremediation and recycling.
Filed report with Regional Water Quality Control Board. |
|
|
Project: |
Site Remediation - Transportation and
Warehousing Facility |
Client: |
Inter-American Distributing Corporation |
Services: |
Remediated petroleum hydrocarbon-contaminated soil from
transportation and warehousing facility by excavation with backhoe and excavator. Employed
mobile laboratory to monitor progress of remediation. Transported contaminated soil to licensed
disposal facility for bioremediation and recycling. Filed final closure report with responsible
regulatory agency. |
|
|
Project: |
Site Remediation - Heavy Constrution
Yard |
Client: |
Ray Wilson Company |
Services: |
Profiled, overpacked, and removed 30 55-gallon drums of various
hazardous wastes (form oils, sealers, paints, and glues) from heavy construction yard. Waste
materials were transported to licensed disposal facility for treatment and/or destruction and
recycling (such as fuel blending for bunker fuel). Recommended soil sampling/analysis of former
drum storage area and adjacent areas for possible presence of petroleum hydrocarbons, volatile
organics, and toxic heavy metals. Submitted preliminary closure report to client. |
|
|
Project: |
Site Remediation - Industrial Cleaning
Equipment and Chemicals |
Client: |
Hako Minuteman |
Services: |
Remediated petroleum hydrocarbon-contaminated soil (waste oil) from
yard of industrial cleaning equipment and chemicals facility -- site of an undetermined oil
spill -- with backhoe and excavator in area of difficult access. Employed mobile laboratory
to monitor progress of remediation. Transported contaminated soil to licensed disposal facility
for bioremediation and recycling. Submitted final closure report to client. |
|
|
Project: |
Site Remediation - Metal Recycling
Facility |
Client: |
Confidential Client |
Services: |
Remediated petroleum hydrocarbon and volatile organics-contaminated
soil from several locations on site of metal recycling facility by excavation with a backhoe,
including locations with limited access. Transported contaminated soil to licensed disposal
facility. Triple rinsed steam cleaning pit and machine vaults. Submitted final closure report
to client. |
|
|
Project: |
Site Remediation - Plastics Recycling
Facility |
Client: |
Aerospace Dynamics International |
Services: |
Remediated petroleum hydrocarbon and volatile organics-contaminated
soil at site of plastics recycling facility by excavation with a backhoe. Transported
contaminated soil to licensed disposal facility. Triple rinsed steam cleaning pit, machine
vaults, and sumps. Submitted final closure report to client. |
|
|
Project: |
Site Remediation - Truck Parts and Repair
Facility |
Client: |
Confidential Client |
Services: |
Remediated petroleum hydrocarbon contaminated-soil from truck parts
and repair facility -- site of former leaking dispenser associated with underground storage
tanks -- with backhoe. Employed mobile laboratory to monitor progress of remediation.
Transported contaminated soil to licensed disposal facility. Submitted final closure report to
responsible regulatory agency. |
|
|