Project: |
Feasibility Study of Centralized
Electroplaters' Business Park for Waste Minimization |
Client: |
Sarkisian Associates |
Services: |
Conceptual design and financial analysis of centralized location
for plating operations, including simplified permitting, scrubber system, segregated rinsewater
collection system, and maximized metals recovery. |
|
|
Project: |
Wastewater Treatment Minimization Study
and System Redesign for Truck Repair Facility |
Client: |
Confidential Client |
Services: |
Analyzed truck and truck parts washing/degreasing area for
minimization of rinsewater to be treated, as well as top-skimmed and bottom-collected oils and
sludges in sumps. Study included redesign of system. |
|
|
|